Material has to be bought before you're paid
Take a deposit when the job is booked, so the timber isn't coming out of your pocket while the job waits.
Install, sand, refinish. Priced by area, done over days, and often needing a deposit before the timber is ordered. QuixChex handles all three parts of that on one job record.
How a job runs
Customer wants 900 square feet refinished. You quote off area, take a deposit, and book it. Your installer clocks in at the site over three days. The balance bills on completion, with those three days already costed on the job.
Priced off area at your own rate, not out of a spreadsheet somebody keeps on their own laptop.
Taken on approval, so you are not buying the timber out of your own pocket and waiting to be made whole.
Three installer days are already costed on the job by the time the final charge goes out.
Floor down. Material covered. Paid.
Take a deposit when the job is booked, so the timber isn't coming out of your pocket while the job waits.
Sanding and refinishing an existing floor bills differently from laying a new one, and both can sit on the same customer.
Quote off floor area at your own rate, and the estimate carries through to the invoice without being rebuilt.
Day one
Say you run a flooring business and QuixChex sets this up for you before you've typed anything. Every price is editable — they're a starting point, not a rule.
| Service | What it covers | Starting price |
|---|---|---|
| Hardwood Install (per sq ft) | Labor and materials, nail-down. | $6.5 |
| Engineered Install (per sq ft) | Glue or float, labor and materials. | $5.25 |
| Sand & Refinish (per sq ft) | Three-pass sand, stain and finish. | $3.75 |
| Screen & Recoat (per sq ft) | Buff and one finish coat. | $1.85 |
| Stain — Custom Color (per sq ft) | Color match and application. | $0.9 |
| Water-Based Finish Upgrade (per sq ft) | Low-odor, faster cure. | $1.1 |
| Subfloor Prep / Leveling (per sq ft) | Level and prepare the substrate. | $1.75 |
| Tear-Out & Disposal (per sq ft) | Remove existing floor and haul away. | $1.5 |
| Stair Tread & Riser (each) | Supply and install, per step. | $145 |
| Shoe Molding / Quarter Round (per linear ft) | Supply and install. | $3.25 |
| Transition Strip (each) | Threshold or reducer. | $65 |
| Board Repair / Weave-In (per board) | Replace damaged boards and blend. | $95 |
| Furniture Move & Reset | Clear and replace furnishings. | $275 |
| Mobilization / Minimum Charge | Minimum call-out for a small area. | $450 |
FAQ
Yes. Split the job into a deposit and a balance so the timber is paid for before it's ordered, not after the job is done.
Yes. Per-area pricing is your own rate on the line item, and the quantity is set when you build the job.
Yes. A job runs across as many days as it takes, and each installer goes on it with their day rate and the days they worked — half-days included.
No. One rate applies to the whole taxable amount, because the lines on a bid don’t say which of them is labour and which is material. What it does do is hold your rate and whatever you call it, let a single job be marked exempt, and carry an exemption on a customer with their certificate number beside it.
Yes. Waive it and the work carries on without one. The waiver is written into the job’s timeline with who did it and when, so it’s a decision on the record rather than an empty field — and if a deposit link had already gone out, waiving cancels it.
The agreed price, with any approved changes folded in and tax on top, minus what has actually been collected. That’s worked out fresh each time rather than stored, so a change approved on Tuesday doesn’t leave last week’s figure on the screen. The margin sits beside it with the tax taken back out, because that part was never yours to keep.
A short call, on your own services and your own customers. We'll show you what the first week looks like, and talk through what it would take to get you there.